野花香高清在线观看视频播放免费,国产aⅤ无码专区亚洲av,色偷偷色嚕噜狠狠网站,人人妻人人澡人人爽欧美精品

全國服務(wù)熱線:

15853163650
您當(dāng)前的位置:首頁 > 新聞動態(tài) > 行業(yè)新聞
    聯(lián)系我們

    CONTACTS US

    濟(jì)南皓暉建材有限公司,總部位于中國泉城——山東濟(jì)南,是一家專業(yè)生產(chǎn)銷售石塑電梯門套,仿大理石電梯門套的專業(yè)廠家。皓暉建材在電梯門套生產(chǎn)行業(yè)很多年,憑著優(yōu)質(zhì)的產(chǎn)品質(zhì)量和完善的售后服務(wù),在全國各地都有我們的工程案例。

    我們本著“以質(zhì)量求生存 ,靠管理出效益,憑信譽(yù)贏口碑,以實(shí)干筑輝煌”的經(jīng)營理念,公司將立足于當(dāng)代建材現(xiàn)代化發(fā)展前沿,依靠科技、勇于探索,以優(yōu)質(zhì)產(chǎn)品優(yōu)良服務(wù)、信譽(yù)與廣大用戶攜手共創(chuàng)輝煌。

    聯(lián)系電話: 15853163650

    工廠地址:山東濟(jì)南章丘區(qū)(歡迎廣大客戶來廠勘察)

行業(yè)新聞

COMPANY NEWS

仿大理石uv板的安裝順序

2018-05-04 09:42:18 文章來源:www.cz1z.com

仿大理石uv板安裝記住這四個(gè)順序:先頂后墻,先板后線,自下而上,從外往里。

Like marble UV board installation, remember these four orders: first, the top and back walls, the first plate and the back line, from bottom to top, from outside to inside.


頂后墻是指先安裝吊頂再安裝墻板。安裝吊頂時(shí)需要先固定好龍骨;在墻板安裝第一塊仿大理石uv板需先用鋼釘固定在墻板上,以后每安裝一塊一邊扣在前一塊仿大理石uv板上,另一邊用在打釘邊上固定。安裝時(shí)要注意整體的畫面設(shè)計(jì),需先分格彈線,根據(jù)預(yù)先設(shè)計(jì)好的圖紙安裝。如遇到插座位置,需要預(yù)先留好插座口。

The top wall is the first installation of the ceiling and then the wall plate. When installing the ceiling, we need to fix the keel first; the first piece of marble UV board in the wall board should be fixed on the wall plate first with the steel nail, and then one piece is fastened on the front of the previous imitation marble UV board, and the other is fixed on the side of the nail. When installing, attention should be paid to the overall picture design, which needs to be divided into lattice shells and installed according to the pre designed drawings. If there is a socket outlet, you need to reserve a socket outlet in advance.
仿大理石uv板
先板后線是指先安裝主要的板材,再安裝線條,先大面積安裝,再處理轉(zhuǎn)角、收邊等細(xì)節(jié)。如果遇到立柱,可采用背面開槽的方法將立柱包住。

The first line is to install the main plate first, then install the line, then install it in a large area, then handle the details such as corner and edge. If a column is encountered, the column can be wrapped by the method of slotting on the back.

自下而上是指安裝墻板時(shí),需要先從墻底開始安裝,逐漸往上增加,直到安裝完整個(gè)墻板。

From bottom to top, when installing wall panels, it is necessary to install them from the bottom of the wall first, and then increase gradually until the complete wall panels are installed.

從外往里是指從房間進(jìn)門的墻板開始往里的順序安裝,這是因?yàn)榘惭b到最后部分需要切割,從外往里安裝更加的美觀。

From the outside, the wall board from the room starts to start in the order of the inside, this is because the final part of the installation needs to be cut, from the outside to install more beautiful.

整體上來說,集成墻頂安裝非常便捷,直接安裝在毛坯墻板,兩個(gè)木工師傅即可完成。如果墻板不平,則需要在安裝前找平墻板。

On the whole, the installation of the integrated wall top is very convenient, it is directly installed on the blank wall panels, and two woodworking masters can complete. If the wall is uneven, the wall panel must be leveled before installation.



中国大陆高清aⅴ毛片| 国产欧美精品123区发布| 寂寞少妇在哪个软件能约到| 亚洲av无码国产精品午夜久久| 黑帮大佬和我的365天| 色琪琪av中文字幕一区二区| 日韩av无码一区二区三区不卡| 调教拨开两唇打花蒂戒尺| 搡女人真爽免费视频大全| 特色表演| 国产一区二区精品丝袜| 好硬啊进一得太深了a片| 国产香港明星裸体xxxx视频| 又白又嫩毛又多15p| 蜜桃成人无码av在线观看一电影| 军人的粗大h拔不出来| 男女免费观看在线爽爽爽视频| 乖让我尿到里面h| 日韩午夜欧美精品一二三四区| 年轻 娇小 亚洲人 日本语 夹| 亚洲爆乳成人无码aaa片漫画| zootubexvideos另类| 不戴胸罩的瑜伽教练| 成人试看120秒体验区| 小寡妇高潮流白浆a片| 天天综合天天做天天综合| 日韩人妻无码一区二区三区| 第一次进入女朋友的身体注意事项 | 青青草国拍2018| 国产精品麻豆成人AV电影 | 永久免费无代码开发平台网站| 免费看无码毛视频成片| hd老熟女bbn老淑女| 成人色情视频免费观看| 国模嫣然生殖欣赏337p| 人妻互换hd无码中文在线| 欧美熟妇大胆bbww| 猛烈h继攵禁忌h| bgmbgmbgm毛多老太免费| 四虎国产精品永久地址| 迎合疯狂肉伦耕耘播种|